Scope of Work
- Installation of a 1,600 kVA transformer facility
- Preparation and implementation of the factory’s electrical designs
- Low-voltage (LV) electrical infrastructure and distribution systems
- Turnkey electrical installation works
- Installation of fire alarm and CCTV systems


