Electrical infrastructure, explosion-protected (Ex) systems and automation integration works were carried out at KCC Boya’s manufacturing facility in the Gebze Organized Industrial Zone. The project included power supply for production equipment, motor control, electrical panels and industrial field installations.
Scope of Work
- Electrical infrastructure for two 3,000-litre paint mixer tanks
- Installation of a 110 kW Ex-proof motor and a 132 kW ABB variable frequency drive
- Manufacturing of Ex-proof main control panels
- Electrical distribution panels and cable installation
- Ex-proof electrical installations and cabling systems
- Automation infrastructure and system integration


