Seçkin Elektrik A.Ş. carried out power transmission line construction and related infrastructure works to connect a 12 MW solar power plant to the Ürgüp substation.
Scope of Work
- Power transmission line construction
- Total line length of 25 km
- Installation of 68 transmission poles
- A total of 6 km of trenching works
- Connection of the 12 MW solar power plant to Ürgüp Substation